Ship B is a bulk carrier, which docked at a port in Guangdong. Before go to the Indonesia, the ship owner want to clean it without damaging the hull. When the Neptune team arrived, a northwest wind of force 3-4 was stirring up waves of 0.5-1.5 meters in height, with the strongest currents reaching 4 knots.
The harsh working environment did not affect the Neptune robot. With its extraordinary wave resistance, it closely adhered to the ship’s hull and performed normally. The Neptune robots completed the cleaning during the cargo loading and unloading time.